Execute SideB_Bottom: 092.03_02__021_lure_SideB_Bottom_57.ngc
Cut SideA and SideB from woodstock using bandsaw
Remove SideA/SideB from respective sections of workstock
Align SideB and SideA in vise using wood scraps
See vise alignment.
Drill two Pin Guide holes 3/32 or .09375 through SideB and well into SideA
See centerline - drill.
Pin SideB to SideA such that the SideB-SplitFace is on top (both SideB/A surfaces touching and SideA SplitFace is on bottom
See frontal and side views.
Secure and align in vise
Using the dremel scribe locate/verify the center line of the SideB SplitFace
{SideB} Scribe a groove along the centerline to a depth suitable for through-wire
{SideB} Using scribe point locate the center of belly hook bore hole. Raise scribe to allow install of End Mill.
{SideB} Bore a shallow hole (1/4 End Mill) at the centerline locate at the desired point for the belly-hook wire.
{SideB} Drill Belly Hook Hole to suit wire (1/16). Run drill deep into SideB but do not penetrate to SideA.
{SideB} Bore slot for lip if desired or wait until fully assembled and pond tested.
Remove both sides from vise. Separate sides and remove pins.
Then hand hold SideB and completed drilling Belly Hook Hole.
Create belly hook through wire anchor loop. The main through wire will run through the anchor loop. So keep it small.
Create a through wire and a belly wire as one subassembly.
Using both sides, the dowel pins, and subassembly through wire temporarily assemble the lure with the through wires.
Create front loop-point using 5/64 drill bit <.078125> or smaller
Create belly wire loop to through wire
Create belly-hook-loop
Create tail-hook loop
{SideA} Gentley hand ream (1/4 End Mill) any belly hook loop mating hole if needed.